Shockey Precast has added to its roster of 400-plus parking decks a 689-space structure extending 67 feet below grade and doubling as a foundation for a planned 1.5 million-sq.-ft. University of Pennsylvania and Pennsylvania Health System facility in Philadelphia. A precast schedule emanating from the producer’s Winchester, Va., flagship plant includes 1,137 pieces, the largest reaching 41 tons; 220,000 sq. ft. of double tee beams; 125,000 sq. ft. of wall panels; and, 17,000 sq. ft. of flat slabs.
Read More