Charah lands 2M-ton ash processing contract in Southeast

Sources: Charah Solutions Inc., Louisville, Ky.; CP staff

A Southeastern utility has tapped Charah Solutions for a Closure by Removal impoundment project encompassing upward of 100 acres of ash deposits at a coal-fired power station that was retired in 2015. Work will include installation of environmental controls plus rail infrastructure improvements and extension, along with loadout area construction. Over a multi-year contract, Charah anticipates processing of 2 million-plus tons of impounded material for beneficial use as concrete-grade fly ash, while preparing the former pond acreage to be restored as usable property. 

Read More