Sources: Oldcastle Precast Inc., Atlanta; CP staff
Oldcastle Precast’s Fontana, Calif., operation is set to close by month’s end the Interstate 210/Foothill Freeway Pavement and Slab Replacement Project precast schedule. Over an April 2016–March 2017 window, the producer is fabricating 6,500 precast slabs, 12.5-ft. wide x 11.33-ft. long to replace 9.7 miles of deteriorated, mainline pavement north of Los Angeles.
Read More