Holcim informs GE-led, DOE-backed wind turbine base investigation

Paris-based GE Renewable Energy staged a mid-April inauguration for a Bergen, N.Y. research and development facility equipped to fabricate up to 20-meter high wind turbine base structures with outsized 3D concrete printers. The facility positions a 20-member team to optimize such concrete practice, potentially leading to fabrication of turbine pedestals’ bottom portions on-site and lower material and equipment transportation costs…

Read More