As part of California Department of Transportation’s $1.6 billion Santa Ana Freeway (Interstate 5) South Corridor Improvement Project, Oldcastle Precast-Perris is fabricating 158.5-ft. prestressed concrete super girders for the Norwalk-San Antonio Bridge—built in stages entailing placement of seven, four and nine beams.
Read MoreTag: Oldcastle Precast
Precast Concepts hosts Colorado lawmaker delegation
After flooding and wildfires have increased scrutiny of materials used in the state’s roadway systems, Precast Concepts hosted a Colorado Senate and House Transportation Committee tour of its Henderson pipe and drainage structures plant, west of Denver, informing lawmakers on infrastructure quality, safety, design and life cycle costs.
Read MoreCanyon Contour
Oldcastle Precast channels safety, water conservation through nearly two miles of pipe, custom box culvert
Special precast box culverts were used for one of the most significant segments of the $25.8 million Cache Water Restoration Project (CWRP), an emergency upgrade of approximately six miles of mostly open, unlined channels and canals.
Read MoreOldcastle Precast ships record-length Caltrans girders
Sources: Oldcastle Precast, Perris, Calif.; CP staff
As part of California Department of Transportation’s $1.6 billion Santa Ana Freeway (Interstate 5) South Corridor Improvement Project, Oldcastle Precast-Perris is fabricating 158.5-ft. prestressed concrete super girders for the Norwalk-San Antonio Bridge—built in stages entailing placement of seven, four and nine beams.
Read More