Sources: National Precast Concrete Association; Kie-Con Inc., Antioch, Calif.; CP staff
Kie-Con has shipped four of seven prestressed California Wide-Flange girders, which at 159 ft. 5 in. are the longest non-spliced, monolithic precast members delivered by trailer to a Golden State bridge site. The girders are 12 inches longer than similarly configured beams Oldcastle Precast–Perris is fabricating for the Santa Ana Freeway South Corridor in southern California.
Read More