Concrete maturity monitor accelerates forming schedules, satisfies inspectors

42 ACRI 150

Concrete maturity can be determined by profiling temperature within the hardening. This benefits the project in both quality and speed of construction as adequate hydration can be determined and forms/shoring removed once target strength development is confirmed. The challenge is making sure that the temperature data is accurate and reliable, especially in the minds of engineers, quality control representatives and owner representatives who are responsible for finished slabs and structures.

Read More