Construction rebound bolsters St. Lawrence Seaway traffic

15 Sea 150

A U.S. construction surge has boosted bulk material transfer through the Great Lakes-St. Lawrence Seaway since the start of the 2015 season. Officials report dry bulk cargo volume of nearly 3 million metric tons, up 7.5 percent through the first part of the season, April–June, against figures for the same period in 2014. Materials leading the way in volume gains are stone, with 102,000 metric tons delivered through June, up 24 percent from last year, and cementitious materials, with 563,000 metric tons, a 9.5 percent jump.

 
Read More