Sources: ECOncrete Tech Ltd., Tel Aviv; Port of San Diego, California; CP staff The Port of San Diego and ECOncrete have begun a three-year demonstration along Harbor Island to gauge interlocking Coastal Tide Pool Armor precast units’ structural and marine species-friendly aspects. The 7,200-lb. Coastalock units appear as two pyramids connected at their bases, with approximately 5-ft. sides or edges.…
Read More