Researchers evaluating the American Concrete Institute’s Guide to Formed Concrete Surfaces (ACI 347.3R-13) contend that a) suggested measurements or other criteria used in assigning a given formed surface to one of the document’s four categories is neither objective nor practical; b) converting ACI 347.3R-13 recommendations to specification requirements could result in disputes and litigation; and, c) preparation of concrete mockups for architect or engineer approval is superior to guide methodologies.
Read MoreTag: ACI 347
Contractors, CIM research finds mockups best ACI 347 formed-surface criteria
Sources: American Society for Concrete Contractors, St. Louis; CP staff
Researchers evaluating the American Concrete Institute’s Guide to Formed Concrete Surfaces (ACI 347.3R-13) contend that a) suggested measurements or other criteria used in assigning a given formed surface to one of the document’s four categories is neither objective nor practical; b) converting ACI 347.3R-13 recommendations to specification requirements could result in disputes and litigation; and, c) preparation of concrete mockups for architect or engineer approval is superior to the guide’s methodologies.
Read More