A failing 144-in. corrugated metal pipe tunnel in Lewiston, Maine, was replaced with a reinforced concrete pipe (RCP) structure using an innovative installation method. The contractor, Diaz Corp. of Jay, Maine, devised the method to avoid having to excavate the pipe in place under existing and proposed streets, highway ramps and a railway line, sometimes at depths of 45 to 55 feet. Diaz had the choice of either pulling (by winch) or pushing the concrete pipe in place over a distance of 1,048 feet. Either way, there would be no digging involved, and the project could be scheduled and carried out during winter conditions.

First constructed in 1972, the large-diameter metal culvert (tunnel) conveys the flow of Jepson Brook under highway ramps, railway and local roads. Any sign of failure with this major structure had to be addressed immediately. Piece-meal rehabilitation was not an option.

Diaz contacted Strescon Ltd. of Saint John, New Brunswick, to supply the 108-in.-diameter RCP. Strescon used the dry-cast method for the first time to produce such large-diameter pipe. During the winter months of 2001 and 2002, the 31,500-lb. sections were produced in Strescon's new plant.

Choosing to push the concrete pipe in place, the contractor fabricated a special cart that was driven into the existing metal pipe. A couple of jacks were used to lift the precast concrete pipe off the ground while the cart was pushed along the existing tunnel with a Bobcat loader. In most cases, the cart had to maneuver through six to eight inches of running water inside the pipe. As a section of pipe was moved into position, the jacks were lowered and the pipe homed with the previously positioned pipe using two 6-ton come-alongs anchored in two holes that were later used for pumping grout between the old metal and new concrete pipe. The process was repeated for each unit of pipe by pulling the cart out of the tunnel and loading it with another concrete pipe. No special reinforcement of the bells of the pipe was necessary since the pipe was homed using come-alongs.

With an overwhelming need for the rehabilitation and upgrade of infrastructure in North America, more innovative approaches to installing reinforced concrete pipe are in demand. Although most rehabilitation projects involve routine construction practices, periodically the contractor, owner and consulting engineer will be challenged to come up with innovative technologies. In this case, a solution was found to a problem that would have cost a great deal more to correct if the conventional open-cut method had been used. As this project demonstrates, the versatility of reinforced concrete pipe can contribute significantly to improving our underground infrastructure and providing drainage systems that will endure for generations.

Gaetan Vaillancourt is Pipe Division Manager with Strescon Limited, Saint John, New Brunswick, 506-633-8877; this report was initially prepared for American Concrete Pipe Association

JEPSON BROOK CULVERT REHABILITATION

AT A GLANCE

Owner
Maine Department of Transport

Designer
Maine Department of Transport

Contractor
Diaz Corporation, Jay, Maine

Quantities
1,048 feet — 108-inch diameter Class V RCP

Producer
Strescon Limited
Saint John, New Brunswick, Canada

Get Copyright Clearance Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Job Zone

Various Positions

Mid Atlantic Precast: Premier Structural/Architectural Prestressed/Precast Producer now interviewing experienced and dedicated team members to join in our new state-of-the-art production facility located in the vibrant Mid-Atlantic region.

More Listings? Click here for more info!

Free product information

Free product information