Gate Precast uses hollow core to lower costs for hotel project

IMAGE

Two Marriott hotels near Orlando’s Mall at Millenia are being built within a single structure as part of a dual-brand hotel concept made possible, in part, by the adaptability of precast. Gate Precast will produce and install 158,841 square feet of 8-in. hollow core precast and 6,156 square feet of 8-in. solid slab structural precast for the project.

Read More